DistantNews
Support us
A7 near Rendsburg to close overnight, with traffic diverted via A210
๐Ÿ‡ฉ๐Ÿ‡ช Germany /Energy & Infrastructure

A7 near Rendsburg to close overnight, with traffic diverted via A210

From Die Zeit · () German

Translated from German and summarized by DistantNews. Read the original for the full story.

At a glance

Newswire Official statement Ongoing story
  • The northbound A7 will close near the Rendsburg interchange from Tuesday at 8 p.m. until Wednesday at 5 a.m.
  • Workers will set up the route for construction in the coming weeks and apply road markings after changes to the building schedule.
  • Drivers heading toward the Rader High Bridge will be diverted via the A210 and Bredenbek before rejoining the A7.

A short section of the northbound A7 near Rendsburg will close overnight because construction plans around the Rader High Bridge have changed.

The closure runs from 8 p.m. Tuesday until 5 a.m. Wednesday at the Rendsburg interchange. The Autobahn GmbH said crews still need to establish the route for the coming weeks and apply lane markings.

Drivers traveling north from the south toward the Rader High Bridge will leave the A7 at the Rendsburg interchange and take the A210 toward Kiel. At the Bredenbek exit, they must leave the motorway and travel back in the opposite direction to the Rendsburg interchange, where they can rejoin the northbound A7.

A buffer zone has been set up before the closure for oversized and heavy-load vehicles. After any necessary wait, those vehicles will be guided through the closed section.

About this summary

Originally published by Die Zeit in German. Translated, summarized, and contextualized automatically by DistantNews, with a note on how the source frames the story. Not individually reviewed before publishing. How this works.