DistantNews
Support us
๐Ÿ‡ฐ๐Ÿ‡ฌ Kyrgyzstan /Energy & Infrastructure

Almaty-Bishkek highway to be expanded to eight lanes

From 24.kg · () Russian

Translated from Russian, summarized and contextualized by DistantNews.

At a glance

News Sources not specified New plan
  • The Almaty-Bishkek highway section in Kazakhstan will be expanded from four to eight lanes to handle over 70,000 daily vehicles.
  • The reconstruction project, spanning 19 to 27 kilometers, aims to increase capacity, improve safety, and reduce travel time.
  • Work is scheduled for completion by December 2027, including new interchanges, pedestrian crossings, and lighting.

Kazakhstan is undertaking a major reconstruction of a key transport corridor, expanding the Almaty-Bishkek highway from four to eight lanes. The project targets the section between kilometers 19 and 27, an area that experiences heavy traffic with over 70,000 vehicles passing daily.

The current four-lane road struggles to accommodate the immense vehicle flow, leading to frequent traffic jams, reduced average speeds, and an increased risk of accidents. The expansion is expected to significantly boost the capacity for vehicles entering and exiting Almaty, enhance traffic safety, and shorten travel times for commuters and freight.

Beyond widening the roadway, the project includes the construction of two "horseshoe" type interchanges and nine overhead pedestrian crossings. Additionally, sidewalks will be installed along the entire stretch, accompanied by a new street lighting system and fresh road surfacing. The entire reconstruction is slated for completion by December 2027.

DistantNews Editorial

Originally published by 24.kg in Russian. Translated, summarized, and contextualized by our editorial team with added local perspective. Read our editorial standards.