Bottleneck strains Prague trains; fourth track planned but years away
Translated from Czech, summarized and contextualized by DistantNews.
At a glance
- Prague's rail infrastructure faces capacity issues, particularly between Libeň, Běchovice, and Klánovice.
- A study by the Association of Passenger Carriers (SVOD) highlights the strain on the network.
- Proposed solutions, including a fourth track near Běchovice and the Libeň flyover, are planned but construction won't begin before 2029.
Prague's rail network is struggling to keep up with increasing passenger numbers, with critical sections operating at their capacity limits. The primary bottleneck is identified in the rail corridor stretching from Libeň through Běchovice and Klánovice towards Kolín.
This strain was highlighted in a recent study by the Association of Passenger Carriers (SVOD), which underscores the urgent need for infrastructure improvements. The study points to the metropolitan area's rail lines reaching their operational limits.
To alleviate the congestion, the Railway Administration (SŽ) has outlined several construction projects. These include plans for a fourth track near Běchovice and the development of the Libeň flyover. However, these much-needed upgrades are not expected to commence until 2029 at the earliest, leaving current capacity issues unresolved for the immediate future.
Originally published by iDNES in Czech. Translated, summarized, and contextualized by our editorial team with added local perspective. Read our editorial standards.