DistantNews
Support us
Bucharest City Hall tenders modernization of Dimitrie Pompeiu Boulevard for over 256 million lei
๐Ÿ‡ท๐Ÿ‡ด Romania /Energy & Infrastructure

Bucharest City Hall tenders modernization of Dimitrie Pompeiu Boulevard for over 256 million lei

From Adevฤƒrul · () Romanian

Translated from Romanian, summarized and contextualized by DistantNews.

At a glance

News Named sources New plan
  • Bucharest City Hall has launched a tender for the modernization of Dimitrie Pompeiu Boulevard, a major infrastructure project.
  • The estimated value of the contract is over 256 million lei and includes design, technical assistance, and construction.
  • The project aims to transform the congested street into a modern avenue with two lanes, green spaces, bike paths, and a double tram line.

Bucharest City Hall has announced the launch of a tender for the extensive modernization of Dimitrie Pompeiu Boulevard, a critical infrastructure project aimed at alleviating traffic congestion in the capital. The estimated value of the contract for the project, which includes design, technical assistance, and execution of works, stands at over 256 million lei (approximately $55 million USD).

Mayor General of Bucharest, Ciprian Ciucu, highlighted the project as one of his top three priorities, stating it will radically transform one of the city's most congested areas. "Dimitrie Pompeiu is in an area frozen in time and traffic. But it will be transformed from a narrow street choked with cars, with one lane per direction and broken sidewalks, into a modern road with two lanes of traffic, green space, bicycle paths, a double tram line, and much more generous sidewalks," the mayor stated.

The project entails widening the boulevard and extending the tram infrastructure to connect with Bulevardul Barbu Vฤƒcฤƒrescu, integrating tram lines 16 and 36 with line 5. A pedestrian overpass will also be constructed. Additionally, a connecting road between ศ˜oseaua Pipera, Dimitrie Pompeiu Boulevard, and Strada Fabrica de Glucozฤƒ is planned to further ease traffic in northern Bucharest.

Authorities have set July 28 as the deadline for bid submissions. The winning contractor will have 26 months from the order to commence work to complete the project, with the contract to be awarded based on the "best quality-price ratio" provided no appeals are filed.

Along with Prelungirea Ghencea, this project is in the top three priority projects that I have undertaken. Dimitrie Pompeiu is in an area frozen in time and traffic. But it will be transformed, from a narrow street choked with cars, with one lane per direction and broken sidewalks, degraded, into a modern road with two lanes of circulation, green space, bicycle paths, a double tram line and much more generous sidewalks.

โ€” Ciprian CiucuThe Mayor General of Bucharest describing the planned transformation of Dimitrie Pompeiu Boulevard.
DistantNews Editorial

Originally published by Adevฤƒrul in Romanian. Translated, summarized, and contextualized by our editorial team with added local perspective. Read our editorial standards.