Bulgaria-North Macedonia Border Crossing 'Klepalo' to Be Ready by End of 2029
Translated from Bulgarian, summarized and contextualized by DistantNews.
At a glance
- A new border crossing, GKP Klepalo, between Bulgaria and North Macedonia is scheduled for completion by the end of 2029.
- The announcement was made by Deputy Minister of Regional Development and Public Works Dessislava Georgieva in Blagoevgrad.
- The construction of this crossing was previously agreed upon by both nations.
Bulgaria and North Macedonia are set to enhance their border infrastructure with the planned completion of the GKP Klepalo border crossing by the end of 2029. This development aims to improve connectivity and facilitate smoother transit between the two neighboring countries.
Dessislava Georgieva, Deputy Minister of Regional Development and Public Works, announced the timeline during a press conference in Blagoevgrad. The establishment of this new crossing point is a result of bilateral agreements aimed at strengthening regional cooperation and economic ties. The project signifies a commitment to improving cross-border movement.
The construction of GKP Klepalo is expected to streamline logistical processes, potentially boosting trade and tourism. This initiative is part of broader efforts to enhance the infrastructure network in the Balkan region, fostering greater integration and accessibility.
By the end of 2029, GKP Klepalo with North Macedonia must be ready.
Originally published by Dnevnik in Bulgarian. Translated, summarized, and contextualized by our editorial team with added local perspective. Read our editorial standards.