DistantNews
Support us
Cable crossing installed over Trishuli River to reconnect two Nuwakot wards

Cable crossing installed over Trishuli River to reconnect two Nuwakot wards

From OnlineKhabar English · () English

Summarized by DistantNews. Read the original for the full story.

At a glance

News Sources not specified Outcome reported
  • A cable crossing now links Wards 1 and 9 of Bidur Municipality in Nepal’s Nuwakot district.
  • Flooding in the Bhotekoshi River on August 26 had cut the connection between the two wards.
  • Residents have begun using the crossing despite the risks involved.

A cable crossing has been installed over Nepal’s Trishuli River, restoring a travel link between Ward 1 and Ward 9 of Bidur Municipality in Nuwakot.

The connection between the two wards was severed after devastating floods in the Bhotekoshi River on August 26. The crossing was installed on Tuesday morning to help residents move between the two sides.

People have already started using it, although the crossing carries risks.

About this summary

Originally published by OnlineKhabar English. Summarized and contextualized automatically by DistantNews, with a note on how the source frames the story. Not individually reviewed before publishing. How this works.