Hydraulic testing planned on 7 April Street in Bishkek
Translated from Russian and summarized by DistantNews. Read the original for the full story.
At a glance
- Bishkek authorities will test heating networks on 7 April Street between Ankara and Akhunbaev streets on September 8.
- Officials warn that testing could damage pipelines, cause road subsidence or sinkholes, and flood areas near the heating network.
- Emergency crews will monitor the work, and residents can report ruptures, road damage or surface water to city dispatch and consumer support services.
Hydraulic testing of heating networks will take place on September 8 on 7 April Street in Bishkek, between Ankara Street and Akhunbaev Street. The work forms part of preparations for the heating season, the Bishkek mayorโs office said.
Authorities warned that testing could damage pipelines, cause road surfaces to sink or collapse, and flood areas near the heating networks. Emergency crews will remain at the work sites and monitor conditions continuously.
If damage is detected, specialists will promptly shut off the affected section. Residents who see a rupture, a road collapse or water emerging at the surface are asked to report it to the dispatch service at 0312568558, or to consumer support at 0312611169, 0557611166, 0777611166 or 0701611166.
Originally published by 24.kg in Russian. Translated, summarized, and contextualized automatically by DistantNews, with a note on how the source frames the story. Not individually reviewed before publishing. How this works.