DistantNews
Support us
๐Ÿ‡ต๐Ÿ‡ฆ Panama /Energy & Infrastructure

IDAAN announces drinking-water connection work for Fourth Bridge project on Saturday

From TVN Panamรก · () Spanish

Translated from Spanish and summarized by DistantNews. Read the original for the full story.

At a glance

News Official statement New plan
  • Panamaโ€™s IDAAN will connect drinking-water lines near the Fourth Bridge over the Panama Canal on Saturday, Sept. 5, 2026.
  • The work will take place between supports E13 and E15 from 9 a.m. to 5 p.m.
  • Residents of Balboa, Tabernilla street, La Boca, and nearby areas could experience irregular water service.

The Institute of Aqueducts and Sewers of Panama, known as IDAAN, announced scheduled drinking-water connection work this Saturday near the Fourth Bridge project over the Panama Canal.

Special Projects personnel will carry out the work from 9 a.m. to 5 p.m. in the section between supports E13 and E15. The activity forms part of the โ€œRelocation of Drinking-Water Systemsโ€ project, which involves adapting existing lines for the bridgeโ€™s construction.

IDAAN warned that water service could become irregular in Balboa, Tabernilla street, La Boca, and surrounding areas while the work continues. The agency advised residents to make the necessary preparations for possible changes in supply.

About this summary

Originally published by TVN Panamรก in Spanish. Translated, summarized, and contextualized automatically by DistantNews, with a note on how the source frames the story. Not individually reviewed before publishing. How this works.