DistantNews
Support us
New Bridge Replaces Footbridge in Cheb, Closing Dyleňská Street Image: MAFRA

New Bridge Replaces Footbridge in Cheb, Closing Dyleňská Street

From iDNES · () Czech

Translated from Czech and summarized by DistantNews. Read the original for the full story.

At a glance

News Sources not specified Ongoing story
  • Construction of a new bridge in Cheb has replaced the so-called Červená footbridge over the railway line toward Schirnding.
  • Dyleňská Street will remain fully closed until September 30 while large reinforced-concrete prefabricated sections are installed.

A new bridge is rising over the railway line between Cheb and Schirnding, replacing the so-called Červená footbridge. The project has brought restrictions for drivers and changes to local traffic.

Dyleňská Street is completely closed until September 30. The closure is linked to the installation of large reinforced-concrete prefabricated sections.

The components were produced at the PREFA Čerčany manufacturing plant near Benešov. The new structure is described as a covered, or “earth-filled,” bridge.

About this summary

Originally published by iDNES in Czech. Translated, summarized, and contextualized automatically by DistantNews, with a note on how the source frames the story. Not individually reviewed before publishing. How this works.