Osh Builds Solid Waste Processing Plant with Electricity Generation
Translated from Russian, summarized and contextualized by DistantNews.
At a glance
- Osh, Kyrgyzstan, is constructing a modern solid waste processing plant with electricity generation capabilities.
- The plant, built by Chinese company Junxin Huanbao KG Invest, will process up to 310,000 tons of waste annually.
- Mayor Zhanarbek Akaev urged for accelerated construction to meet the established deadlines.
Osh, Kyrgyzstan's second-largest city, is undergoing the construction of a significant waste processing facility aimed at tackling solid waste management and generating energy. The project, located in the southern capital, is being undertaken by the Chinese firm Junxin Huanbao KG Invest.
Municipal authorities reported that Mayor Zhanarbek Akaev visited the construction site and emphasized the need to expedite the work to ensure completion within the scheduled timeframe. Once operational, the plant is designed to process a substantial volume of waste, with an annual capacity of up to 310,000 tons.
Beyond waste management, the facility will also produce electrical energy, contributing to the city's power supply. The project is reportedly designed to comply with all contemporary environmental standards, aligning with global efforts towards sustainable development and cleaner industrial practices.
Accelerate the pace of work and complete the construction within the established deadlines.
Originally published by 24.kg in Russian. Translated, summarized, and contextualized by our editorial team with added local perspective. Read our editorial standards.