DistantNews
Support us
PM urges faster work on Muvumba dam project
๐Ÿ‡ท๐Ÿ‡ผ Rwanda /Energy & Infrastructure

PM urges faster work on Muvumba dam project

From The New Times · () English

Summarized and contextualized by DistantNews.

At a glance

News Named sources Ongoing story
  • Rwandan Prime Minister Justin Nsengiyumva urged the contractor of the Muvumba Multipurpose Dam Project to accelerate work and recover lost time.
  • The dam project, intended to boost irrigation and electricity generation, is crucial for the region's agricultural development.
  • Nsengiyumva emphasized the need for timely completion to realize the project's benefits for the local population.

Prime Minister Justin Nsengiyumva has called for an accelerated pace on the Muvumba Multipurpose Dam Project, directing the contractor to make up for lost time. The Prime Minister issued this directive on Saturday, July 11, highlighting the urgency of the project's completion.

The Muvumba dam is a significant undertaking aimed at enhancing irrigation capabilities and increasing electricity generation. Its successful and timely completion is viewed as essential for bolstering agricultural productivity in the region.

Nsengiyumva stressed that recovering lost time is paramount. He underscored the importance of the project in delivering its intended benefits to the local communities, emphasizing the need for efficient execution to ensure the dam serves its purpose in supporting regional development.

recover lost time

โ€” Justin NsengiyumvaPrime Minister Nsengiyumva's directive to the contractor regarding the Muvumba Multipurpose Dam Project.
DistantNews Editorial

Originally published by The New Times. Summarized and contextualized by our editorial team with added local perspective. Read our editorial standards.