Roads to Close in Guayaquil This Sunday for Maintenance and Procession
Translated from Spanish, summarized and contextualized by DistantNews.
At a glance
- Several roads in Guayaquil will experience temporary closures on Sunday, August 23, 2026, for maintenance and a religious procession.
- Closures include the 25 de Julio avenue for pedestrian bridge work and the Avenida del Bombero elevated road for expansion.
- A procession for the Virgen de El Cisne will also cause traffic disruptions in the city center.
Guayaquil's Traffic and Mobility Agency (ATM) announced temporary road closures for Sunday, August 23, 2026, affecting several key routes in the city. These disruptions are due to essential maintenance work and a planned religious procession.
The 25 de Julio avenue, in the southern part of Guayaquil, will see its service lanes closed from 7:00 AM to 7:00 PM. This 12-hour closure is necessary for the replacement of a beam on a pedestrian bridge near the Mall del Sur Metrovรญa stop. Traffic will be redirected through the central lanes during the work, with ATM agents managing the flow.
Additionally, the elevated road on Avenida del Bombero in the northern Ceibos sector will be closed between 8:00 AM and 6:00 PM. This closure is for expansion work on the bridge to accommodate a contraflow lane. Traffic will be maintained on the service lanes during this period.
Later in the day, a procession for the Virgen de El Cisne will cause further traffic modifications. From 2:00 PM to 10:00 PM, the religious procession will move from the San Agustรญn Church in the city center to the Nuestra Seรฑora de El Cisne Catholic Sanctuary in the Suburbio. ATM will deploy 20 uniformed officers and 15 motorcyclists to manage traffic along the procession's route, which includes streets such as Pedro Moncayo, Luis Urdaneta, Machala, and Cuenca.
ATM advises drivers to plan their travel accordingly, consider these closures when navigating the affected avenues and streets, and follow the instructions of traffic agents. The lanes are expected to reopen once the scheduled work is completed.
Originally published by El Comercio in Spanish. Translated, summarized, and contextualized by our editorial team with added local perspective. Read our editorial standards.