DistantNews
Support us
๐Ÿ‡ง๐Ÿ‡ช Belgium /Disasters & Emergencies

Roadworks on E19 in Rumst cause damage to multiple vehicles

From VRT NWS · () Dutch

Translated from Dutch, summarized and contextualized by DistantNews.

At a glance

News Sources not specified Context piece
  • Several cars sustained damage from a pothole at roadworks on the E19 in Rumst, Belgium.
  • The pothole was located on a temporary lane diversion across the central reservation.
  • The roadworks are scheduled to finish by Thursday evening, and affected drivers are advised to contact their insurers.

Drivers using the E19 highway in Rumst, Belgium, have encountered significant damage to their vehicles due to a hazardous pothole at ongoing roadworks. The construction zone has narrowed traffic lanes, directing vehicles over the central reservation. It is on this temporary diversion that a deep pothole, covered by a drainage grate, has caused damage to tires and rims.

People from the tow service said they had to tow 15 to 20 cars.

โ€” Unidentified woman on social mediaDescribing the extent of vehicle damage caused by the pothole.

Reports of the issue have circulated on social media, with one woman sharing photos of her car's damage and seeking others who experienced similar incidents. She noted that tow truck operators had reported assisting between 15 to 20 vehicles that had suffered damage at the site.

The Agency for Roads and Traffic (AWV) confirmed it has received reports of damage through the federal road police. Spokesperson Gilles Van Goethem urged drivers to exercise extra caution. He stated that adhering to the 50 km/h speed limit and staying within the temporary yellow lines would minimize the risk of hitting the grate.

We are aware of this and we advise people to drive extra carefully at the works.

โ€” Gilles Van GoethemSpokesperson for the Agency for Roads and Traffic on the hazardous roadworks.

For those who have incurred damage, the AWV advises them to contact their own insurance providers. The insurers can then follow up with the contractor responsible for the roadworks. The agency also confirmed that the roadworks are expected to be completed by Thursday evening, with traffic returning to the regular lanes by Friday morning.

People who have suffered damage should best take this up with their own insurer. They can then pass it on to the contractor who carried out the work.

โ€” Gilles Van GoethemAdvice from the Agency for Roads and Traffic to drivers with damaged vehicles.
DistantNews Editorial

Originally published by VRT NWS in Dutch. Translated, summarized, and contextualized by our editorial team with added local perspective. Read our editorial standards.