Route 1 crossing in Puntarenas to close for 12 hours for Barranca River works
Translated from Spanish and summarized by DistantNews. Read the original for the full story.
At a glance
- The bridge over Costa Rica's Barranca River will close from 8 p.m. Saturday to 8 a.m. Sunday.
- The existing bridge will be replaced by a new 121-meter structure.
The bridge over the Barranca River on Route 1 in Puntarenas will close for 12 hours, from 8 p.m. Saturday until 8 a.m. Sunday.
The closure will allow work connected to the replacement of the old bridge with a new structure measuring 121 meters.
Originally published by La Naciรณn in Spanish. Translated, summarized, and contextualized automatically by DistantNews, with a note on how the source frames the story. Not individually reviewed before publishing. How this works.