DistantNews
Support us
๐Ÿ‡จ๐Ÿ‡ท Costa Rica /Energy & Infrastructure

Route 1 crossing in Puntarenas to close for 12 hours for Barranca River works

From La Naciรณn · () Spanish

Translated from Spanish and summarized by DistantNews. Read the original for the full story.

At a glance

News Sources not specified New plan
  • The bridge over Costa Rica's Barranca River will close from 8 p.m. Saturday to 8 a.m. Sunday.
  • The existing bridge will be replaced by a new 121-meter structure.

The bridge over the Barranca River on Route 1 in Puntarenas will close for 12 hours, from 8 p.m. Saturday until 8 a.m. Sunday.

The closure will allow work connected to the replacement of the old bridge with a new structure measuring 121 meters.

About this summary

Originally published by La Naciรณn in Spanish. Translated, summarized, and contextualized automatically by DistantNews, with a note on how the source frames the story. Not individually reviewed before publishing. How this works.