Search Ends With 39 Workers Still Missing at Langtang Khola Hydropower Project
Translated from English and summarized by DistantNews. Read the original for the full story.
At a glance
- Rescue teams ended the search for workers missing from the Langtang Khola Hydropower Project after the Bhotekoshi flood.
- Teams found two bodies inside the project tunnel, while 39 workers remain unaccounted for.
- The Nepali Army, Nepal Police and Armed Police Force jointly stopped further efforts inside the tunnel.
The search for workers missing at the Langtang Khola Hydropower Project has ended, with 39 still unaccounted for after the Bhotekoshi flood.
Rescue teams found only two bodies inside the projectโs tunnel before calling off the operation. The joint team included the Nepali Army, Nepal Police and Armed Police Force.
The teams stopped further searches inside the tunnel after determining that continued efforts would not yield additional results.
Originally published by OnlineKhabar English in English. Translated, summarized, and contextualized automatically by DistantNews, with a note on how the source frames the story. Not individually reviewed before publishing. How this works.