DistantNews
Support us

Search intensified at Upper Trishuli-3 B as heavy excavators arrive

From OnlineKhabar English · () English

Translated from English and summarized by DistantNews. Read the original for the full story.

At a glance

News From a news agency Ongoing story
  • Search teams intensified efforts at Nepal’s Upper Trishuli-3 B Hydropower Project after three large excavators and a backhoe loader arrived.
  • Of 191 workers who went missing in the August 26 floods, 13 construction employees had been accounted for, according to the report.

Search efforts at Nepal’s 37-megawatt Upper Trishuli-3 B Hydropower Project have intensified after heavy machinery arrived at the site.

Three large excavators and a backhoe loader were brought in to help search for people missing after the Bhotekoshi-Trishuli floods on August 26.

A total of 191 people working at the project went missing in the flood. The report said 13 construction employees had been accounted for.

About this summary

Originally published by OnlineKhabar English in English. Translated, summarized, and contextualized automatically by DistantNews, with a note on how the source frames the story. Not individually reviewed before publishing. How this works.