DistantNews
Support us
Seoul finds 8cm height difference on Dongjak Bridge approach, city assures safety amid wider inspection
๐Ÿ‡ฐ๐Ÿ‡ท South Korea /Energy & Infrastructure

Seoul finds 8cm height difference on Dongjak Bridge approach, city assures safety amid wider inspection

From Dong-A Ilbo · () Korean

Translated from Korean, summarized and contextualized by DistantNews.

At a glance

News Named sources Under investigation
  • A 8-centimeter difference in height was found on the approach road to the Dongjak Bridge in Seoul, following a similar discovery on the Seongsu Bridge.
  • Seoul city officials stated that the bridges are structurally safe but are conducting a full inspection of all Han River bridge approaches.
  • The height difference on Dongjak Bridge was first identified in a 2023 safety inspection and has been monitored periodically.

Seoul city officials are investigating a nearly 8-centimeter height difference found on the approach road to the Dongjak Bridge, connecting Ichon-dong in Yongsan-gu and Dongjak-dong in Dongjak-gu. This discovery comes shortly after a similar 9-centimeter height difference was reported on the southern approach of the Seongsu Bridge earlier this month, raising concerns about the condition of the city's aging infrastructure.

Despite the visible gap, the Seoul Metropolitan Government insists that the bridges remain structurally sound. White styrofoam pieces are visible in the concrete gap, and a sign indicating "structure measurement for safety verification" is posted. The height difference on Dongjak Bridge was initially detected during a detailed safety inspection in 2023 and has been under periodic review.

Officials from the Seoul Metropolitan Government's Bridge Safety Division confirmed that a comprehensive survey of all Han River bridge approaches is underway. The Dongjak Bridge's height difference, like the one on Seongsu Bridge, occurs at the connection point between the bridge structure and the embankment road. While assuring the public of safety, the city's proactive inspection aims to prevent any potential issues before they escalate.

This is a stable condition with no additional subsidence confirmed in this month's comprehensive survey of Han River bridges.

โ€” Seoul Metropolitan Government officialDescribing the current state of the Dongjak Bridge's height difference after a recent inspection.
DistantNews Editorial

Originally published by Dong-A Ilbo in Korean. Translated, summarized, and contextualized by our editorial team with added local perspective. Read our editorial standards.