Serbia Roads announces overnight repairs on Pančevo Bridge from Sept. 2 to 5
Translated from Serbian and summarized by DistantNews. Read the original for the full story.
At a glance
- Serbia Roads will carry out overnight repairs on expansion joints on Pančevo Bridge from Sept. 2 to 5.
- Work will affect traffic in both directions between Belgrade's Bogoslovija area and the Krnjača interchange, with vehicles using the open lane.
Serbia Roads has announced overnight repairs on Pančevo Bridge from Sept. 2 to 5.
The work will focus on expansion joints on the section before the bridge's steel structure, along the state road between Belgrade's Bogoslovija area and the Krnjača interchange.
Crews will work from 8 p.m. to 5 a.m. on Sept. 2 and 3 in the direction from Bogoslovija toward Krnjača. Further overnight work will take place on Sept. 3 and 4, and on Sept. 4 and 5, in the opposite direction.
Traffic will continue through the available lane in the work zone. Serbia Roads said it would secure the area with traffic signs and safety equipment.
Originally published by N1 Serbia in Serbian. Translated, summarized, and contextualized automatically by DistantNews, with a note on how the source frames the story. Not individually reviewed before publishing. How this works.