DistantNews
Support us
๐Ÿ‡ฐ๐Ÿ‡ฌ Kyrgyzstan /Energy & Infrastructure

Tender announced to rebuild bridge over Aravan-Ak-Buura canal

From 24.kg · () Russian

Translated from Russian and summarized by DistantNews. Read the original for the full story.

At a glance

News Documents & data New plan
  • Osh City Roads announced a tender to reconstruct a bridge over the Aravan-Ak-Buura canal in southern Kyrgyzstan.
  • The project will receive 37.4 million soms and includes a new reinforced-concrete bridge, foundations, supports, beams, bearings, waterproofing and asphalt surfacing.
  • Contractors must show experience with at least two similar projects, and applications are due by September 14, 2026.

A tender has been announced in Osh for the reconstruction of the bridge over the Aravan-Ak-Buura canal, with 37.4 million soms allocated for the work.

Osh City Roads, the municipal enterprise responsible for the project, published the bid on the state procurement portal. Applications will be accepted until September 14, 2026.

The project calls for dismantling the existing structures and building a new reinforced-concrete bridge. It also includes new foundations and reinforced-concrete supports, the installation of 14 bridge deck beams and 28 rubber-metal bearings, waterproofing, and a new asphalt-concrete surface.

The selected contractor must have completed at least two similar projects.

About this summary

Originally published by 24.kg in Russian. Translated, summarized, and contextualized automatically by DistantNews, with a note on how the source frames the story. Not individually reviewed before publishing. How this works.