DistantNews
Support us
๐Ÿ‡ท๐Ÿ‡ธ Serbia /Disasters & Emergencies

Two people rescued from Nepal rubble 10 days after flood

From N1 Serbia · () Serbian

Translated from Serbian and summarized by DistantNews. Read the original for the full story.

At a glance

Newswire Official statement Outcome reported
  • Nepalese rescuers found a man in a hydroelectric power tunnel and a woman in a house in Nuwakot, 10 days after a devastating flood.
  • Officials say the disaster killed 1,300 people and left more than 5,000 missing.
  • The flood followed the collapse of a melting Himalayan glacier, sending water and debris through valleys across Tibet and Nepal.

Rescuers in Nepal have pulled two people alive from the ruins 10 days after a devastating flood, officials said.

The government said one man was rescued from a tunnel at a hydroelectric power project under construction. An army spokesman said rescuers also found a woman inside a house in the city of Nuwakot.

Officials have so far recorded 1,300 deaths, while more than 5,000 people remain missing. The flash flood last week followed the collapse of a glacier melting in the Himalayas.

The collapse was so powerful that it registered as seismic activity with a magnitude of 5.2. Rocks and water rapidly raised river levels in narrow valleys, creating a torrent that swept downstream through Tibet and Nepal and destroyed settlements, bridges, roads and land.

About this summary

Originally published by N1 Serbia in Serbian. Translated, summarized, and contextualized automatically by DistantNews, with a note on how the source frames the story. Not individually reviewed before publishing. How this works.