DistantNews
Support us
Corredor Sur highway to see partial closures for beam transport
๐Ÿ‡ต๐Ÿ‡ฆ Panama /Energy & Infrastructure

Corredor Sur highway to see partial closures for beam transport

From TVN Panamรก · () Spanish

Translated from Spanish, summarized and contextualized by DistantNews.

At a glance

News Named sources Ongoing story
  • Partial closures are scheduled on Panama's Corredor Sur highway starting June 12 to facilitate the transport of large beams for an expansion project.
  • The closures will occur near the Atlapa toll plaza between 9 p.m. and 4 a.m. for about 10 minutes at a time.
  • The project aims to expand the highway's connection to the Costa del Este area, with work expected to last until June 18.

Panama's Corredor Sur highway will experience partial closures beginning Friday, June 12, as the National Highway Company (ENA) moves large beams for the Costa del Este-Hipรณdromo interchange expansion project. The closures will specifically affect the area around the Atlapa toll plaza. These maneuvers are necessary to lift, transport, and position the beams that will form part of a new viaduct connecting to Costa del Este. Arsenio Tejada, ENA Sur's Director of Planning, explained that after the handover of the Hipรณdromo interchange, the movement of these structural components will commence. The beams will travel from Tocumen towards Paitilla, making a U-turn at the Atlapa toll booth before proceeding to Costa del Este for installation. During these operations, total momentary closures of approximately 10 minutes will be implemented, particularly during the return of equipment. These activities are scheduled to take place nightly between 9 p.m. and 4 a.m. Partial closures will also be maintained in Costa del Este while the beams are being lifted and placed. Once the nighttime work concludes, equipment will be removed, and traffic flow will be restored before 4 a.m. The construction work is slated to continue until June 18, and authorities advise drivers to exercise caution and seek alternative routes during the specified hours.

All of this must happen before 4:00 a.m.

โ€” Arsenio TejadaDirector of Planning at ENA Sur, specifying the timeframe for the nighttime construction work.
DistantNews Editorial

Originally published by TVN Panamรก in Spanish. Translated, summarized, and contextualized by our editorial team with added local perspective. Read our editorial standards.