DistantNews

Drivers Warned of Traffic Restrictions in Boom Gorge for Rockfall Clearing

From 24.kg · (6h ago) Russian

Translated from Russian, summarized and contextualized by DistantNews.

TLDR

  • Road maintenance involving rockfall clearing will occur in the Boom Gorge on the Bishkek-Naryn-Torugart highway.
  • Operations are scheduled from April 20 to April 24, between 10:00 AM and 4:00 PM daily.
  • Traffic will be restricted to one lane during clearing, with operations halted if more than 30-40 vehicles accumulate.

BISHKEK: Drivers traversing the vital Bishkek-Naryn-Torugart highway should exercise caution and plan their journeys accordingly, as significant road maintenance operations are slated for the Boom Gorge. From April 20th to April 24th, crews will be engaged in clearing rockfalls along the 129th kilometer of this crucial artery connecting northern and southern Kyrgyzstan.

The "Kyrgyz Temir Zholy" state enterprise has announced that these essential safety measures will take place daily between 10:00 AM and 4:00 PM. During these hours, traffic flow will be partially restricted, with vehicles permitted to pass through on a single lane. This temporary measure is necessary to ensure the safety of both the workers performing the clearing and the motorists using the route.

Recognizing the potential for traffic congestion, the enterprise has implemented a protocol to manage the flow. If more than 30 to 40 vehicles accumulate at the site, the rockfall clearing operations will be temporarily suspended to allow the backlog to clear. This approach aims to minimize disruption while prioritizing the safety and security of the road infrastructure.

Authorities are urging citizens to plan their trips in advance to avoid inconvenience. These rockfall clearing operations are critical for maintaining the integrity and safety of the railway and road transport routes, ensuring reliable passage through the mountainous terrain. The commitment to regular maintenance underscores the importance of this highway for regional connectivity and economic activity.

We ask citizens to plan their trips in advance. These works are carried out to ensure the safety of railway and road traffic.

— Kyrgyz Temir ZholyStatement regarding the necessity and planning for the rockfall clearing operations in Boom Gorge.
DistantNews Editorial

Originally published by 24.kg in Russian. Translated, summarized, and contextualized by our editorial team with added local perspective. Read our editorial standards.