DistantNews
Support us
๐Ÿ‡ฌ๐Ÿ‡ญ Ghana /Disasters & Emergencies

Ghana begins major flood control project in Kaneshie

From Daily Graphic · () English

Translated from English and summarized by DistantNews. Read the original for the full story.

At a glance

News Sources not specified Ongoing story
  • Ghana will begin a one-year critical drainage improvement project in Accra's Kaneshie enclave on September 7, 2026, to address decades of perennial flooding.
  • The project involves constructing a large underground stormwater drain to replace an inadequate existing system, significantly improving flood management.
  • Commuters should expect road closures and traffic diversions for approximately one year, with the government appealing for public cooperation.

Accra, Ghana โ€“ A significant infrastructure project aimed at eradicating the persistent flooding in Kaneshie is set to commence on September 7, 2026. The Ministry of Works and Housing announced that critical drainage improvement works will begin, impacting traffic for about a year as part of the Greater Accra Resilient and Integrated Development (GARID) Project.

While the construction works would cause considerable inconvenience to motorists and residents, the long-term benefits far outweigh the temporary disruptions.

โ€” Ahmed IbrahimMinister of Works and Housing, explaining the necessity of the project despite expected disruptions.

The project, slated for completion by October 2027, will introduce a modern drainage system designed to tackle the decades-long flooding issues that have plagued the Kaneshie area. While acknowledging the inevitable inconvenience caused by road closures and traffic diversions, the government emphasizes that the long-term benefits of enhanced flood protection for lives and property far outweigh the temporary disruptions.

Technical details reveal the construction of a substantial double-cell underground rectangular stormwater drain. This new system, stretching approximately 1.5 kilometers from Mpamprom Junction to First Light Junction, will measure about 10 meters wide. It replaces the current twin 1.2-meter-diameter pipes, which have proven insufficient for the area's drainage needs. The new drain will integrate with existing and recently completed sections, creating a comprehensive stormwater management solution.

The Project Coordinator for GARID, Dr Kwadwo Ohene Sarfo, provided technical details of the undertaking, explaining that the project involves the construction of a double-cell underground rectangular stormwater drain from Mpamprom Junction to First Light Junction along the Dr Busia Highway.

โ€” Dr Kwadwo Ohene SarfoProject Coordinator for GARID, detailing the scope of the drainage construction.

To manage the transition, directional and warning signs are being installed, and the Motor Traffic and Transport Department will assist with on-ground traffic management. Pedestrian walkways and footbridges will also be provided for public safety throughout the construction period. The government has also established toll-free lines and a website for public inquiries and updates, urging motorists and pedestrians to cooperate with contractors and adhere to the diversions.

The government sought the cooperation of the public as works progress to reduce flooding and improve sanitation across Accra.

โ€” Felix Kwakye OfosuMinister of Government Communications, appealing for public support during the construction.
About this summary

Originally published by Daily Graphic in English. Translated, summarized, and contextualized automatically by DistantNews, with a note on how the source frames the story. Not individually reviewed before publishing. How this works.