DistantNews
Support us
Guayaquil Avenue Section to Close for Overpass Construction
๐Ÿ‡ช๐Ÿ‡จ Ecuador /Energy & Infrastructure

Guayaquil Avenue Section to Close for Overpass Construction

From El Comercio · () Spanish

Translated from Spanish, summarized and contextualized by DistantNews.

At a glance

News Sources not specified New plan
  • Two lanes on Juan Tanca Marengo Avenue in Guayaquil will be temporarily closed from August 8 to August 10, 2026.
  • The closure is for the installation of beams for the second overpass being built by the Mayor's Office.
  • Alternate routes and detours for public transport are provided, and drivers are urged to respect speed limits and signage.

Guayaquil authorities will close two lanes on Juan Tanca Marengo Avenue from Saturday, August 8, to Monday, August 10, 2026. The closure, affecting the Vรญa a Daule to Avenida de Las Amรฉricas direction, is necessary for installing beams on the second overpass constructed by the Mayor's Office.

During the work, which will occur near the intersection with Rodrigo Chรกvez Avenue, heavy machinery will be used for lifting the structures. Traffic heading from Avenida de Las Amรฉricas to Vรญa a Daule will remain open with two lanes.

Several alternative routes are recommended for drivers to avoid disruptions. For those heading to Avenida de Las Amรฉricas, they can use Avenida Tanca Marengo towards Avenida Las Aguas, then proceed to Avenida Benjamรญn Carriรณn and reach Avenida Orellana. Drivers exiting Urdenor 2 and Parque Empresarial Colรณn can use Avenida Rodrigo Chรกvez, the Ecological Bridge, Josรฉ Santiago Castillo Avenue, and then Juan Tanca Marengo Avenue.

Public transport lines 123, 55, and 13 will temporarily alter their routes. From Rodrigo Chรกvez Avenue, buses will turn right onto the Ecological Bridge, continue along Josรฉ Santiago Castillo Avenue to Juan Tanca Marengo Avenue, and then use the Francisco de Orellana Avenue interchange to resume their normal routes. The Municipal Transit Authority (ATM) advises drivers to adhere to speed limits and safety signage in the construction zone to ensure safe transit.

DistantNews Editorial

Originally published by El Comercio in Spanish. Translated, summarized, and contextualized by our editorial team with added local perspective. Read our editorial standards.