DistantNews
Support us
Ho Chi Minh City to Widen Key Northwestern Road to 40 Meters, Project Costing Over $137 Million
๐Ÿ‡ป๐Ÿ‡ณ Vietnam /Energy & Infrastructure

Ho Chi Minh City to Widen Key Northwestern Road to 40 Meters, Project Costing Over $137 Million

From Thanh Niรชn · () Vietnamese

Translated from Vietnamese, summarized and contextualized by DistantNews.

At a glance

News Named sources New plan
  • Ho Chi Minh City, Vietnam, plans to widen a nearly 4.5 km inter-ward road in the northwestern area to 40 meters, with construction slated for Q4 2026.
  • The project, costing over 3.5 trillion VND (approx. $137 million USD), aims to improve traffic flow and safety in the Thแป›i An and Thแบกnh Xuรขn wards.
  • The expansion will involve acquiring land from 471 cases, with 114 requiring complete demolition and relocation, and includes building a new bridge.

Ho Chi Minh City is set to undertake a significant infrastructure project to widen the Thแป›i An - Thแบกnh Xuรขn inter-ward road in the northwestern part of the city. The nearly 4.5-kilometer route will be expanded to a 40-meter width, with construction scheduled to begin in the fourth quarter of 2026. The project, with an estimated cost exceeding 3.5 trillion VND (approximately $137 million USD), aims to enhance connectivity and alleviate traffic congestion in the rapidly developing area.

Currently, the road is narrow and in poor condition, with numerous potholes and heavy truck traffic contributing to dust and safety hazards. Local residents have long awaited the upgrade, expressing hopes for smoother commutes and improved conditions for businesses. "This road has caused many people to fall. If someone is careless and drives fast, they can easily encounter danger. During the rainy season, the road is muddy, and in the dry season, dust fills the air. I hope the road is built soon so people can travel conveniently and make a living," shared one local resident.

The project, managed by the Ho Chi Minh City Project Management Board for Traffic Construction (Ban Giao thรดng), will impact 471 properties. Of these, 114 cases will require complete demolition and resettlement. The compensation and site clearance process is underway, with the board aiming to finalize compensation plans by the third quarter of 2026 and hand over the land for construction in the fourth quarter.

Beyond widening the main route to six lanes, the project includes building a new ฤรก Hร n bridge approximately 56 meters long and a 30-meter wide connecting branch road to Lรช Thแป‹ Riรชng street. The upgrade also encompasses the synchronized installation of drainage, lighting, and green infrastructure, adhering to urban road standards. Upon completion, the expanded road is expected to significantly improve the transportation network in northwestern Ho Chi Minh City.

This road has caused many people to fall. If someone is careless and drives fast, they can easily encounter danger. During the rainy season, the road is muddy, and in the dry season, dust fills the air. I hope the road is built soon so people can travel conveniently and make a living.

โ€” Mr. QuรกA local resident describing the current poor conditions of the road and expressing hope for the upcoming expansion.
DistantNews Editorial

Originally published by Thanh Niรชn in Vietnamese. Translated, summarized, and contextualized by our editorial team with added local perspective. Read our editorial standards.