DistantNews
Support us
๐Ÿ‡น๐Ÿ‡ผ Taiwan /Disasters & Emergencies

Kaohsiung flood pond praised for effectiveness during heavy rains

From Liberty Times · () Chinese

Translated from Chinese, summarized and contextualized by DistantNews.

At a glance

News Sources not specified Ongoing story
  • A new flood detention pond in Kaohsiung's Fengshan district is being praised for its effectiveness during recent heavy rains.
  • Local village chiefs reported that areas previously prone to flooding are now dry, crediting the partially completed pond.
  • The Fengshan Bade Flood Detention Pond, expected to be fully completed by year-end, aims to alleviate flooding in the Jian'guo Road area.

A flood detention pond under construction in Kaohsiung's Fengshan district has drawn praise from local officials for mitigating the impact of recent heavy rainfall. Village chiefs in the Wenshan and Wenying neighborhoods reported to city councilor Lin Zhi-hong that areas historically susceptible to flooding remained dry during the downpour, attributing the relief to the partially completed Fengshan Bade Flood Detention Pond.

Lin Zhi-hong, who has advocated for the project for six years, inspected the site with the village chiefs during the heavy rains. They noted that the pond's water storage space, which is already complete, had functioned effectively. "If there were no detention pond, the rainwater might have flooded our homes," one chief reportedly said, highlighting the significant difference the infrastructure has made.

The Fengshan Bade Flood Detention Pond is being built on approximately 4.72 hectares of land, with a budget of 83.5 million yuan. The project, which began construction on October 1, 2023, is scheduled for completion by the end of this year. It is designed to channel runoff from the Fengsong Road and Jian'guo Road Section 2 storm drains, thereby reducing the drainage load downstream and enhancing flood control capabilities for the Jian'guo Road area, which has frequently experienced flooding during heavy rain events.

This time the heavy rain, the places that used to accumulate water and flood are no longer flooding. The detention pond has played a role. If there were no detention pond, the rainwater would have flooded the first floor of the house.

โ€” Village ChiefsLocal village chiefs expressing their satisfaction with the effectiveness of the under-construction flood detention pond during recent heavy rains.
DistantNews Editorial

Originally published by Liberty Times in Chinese. Translated, summarized, and contextualized by our editorial team with added local perspective. Read our editorial standards.