Landslide buries hydropower project camp in Nepal
Translated from English and summarized by DistantNews. Read the original for the full story.
At a glance
- The camp for the Upper Trishuli-3 ‘B’ Hydropower Project in Nuwakot, Nepal, has been completely buried by a landslide.
- The Ministry of Energy, Water Resources and Irrigation stated the site is hazardous, complicating rescue and access efforts.
- Rescue operations, including aerial inspections by helicopter, are ongoing with the priority of safely rescuing all personnel.
A devastating landslide has completely buried the camp area of the Upper Trishuli-3 ‘B’ Hydropower Project in Nuwakot, Nepal. The Ministry of Energy, Water Resources and Irrigation confirmed the incident, describing the site as currently being in an "extremely difficult and hazardous condition."
The severe conditions are posing significant challenges to rescue operations and any efforts to establish access to the buried camp. Despite the risks involved, authorities are continuing with rescue and access-building initiatives. Helicopters have been repeatedly deployed for aerial inspections to assess the situation and guide the ongoing search and rescue efforts.
Necessary equipment for the operations has also been transported to the site via helicopter, and work has commenced. The project management has emphasized that the rescue of people remains their utmost priority, and efforts will persist until every individual at the site is safely recovered.
In light of the sensitive nature of the situation, the project has urged the public to rely solely on official updates and to disregard unverified information or rumors. The focus remains on the critical task of ensuring the safety and recovery of those affected by the landslide.
Originally published by OnlineKhabar English in English. Translated, summarized, and contextualized automatically by DistantNews, with a note on how the source frames the story. Not individually reviewed before publishing. How this works.