DistantNews
Support us
๐Ÿ‡ฒ๐Ÿ‡พ Malaysia /Energy & Infrastructure

Malaysia expects to need 9 GW of gas-fired power by 2032

From Utusan Malaysia · () Malay

Translated from Malay and summarized by DistantNews. Read the original for the full story.

At a glance

News Named sources New plan
  • Malaysia expects to need about 9 GW of gas-fired power capacity by 2032.
  • Rising electricity demand is driving the projected requirement as the country gradually moves away from coal generation.
  • Economy Minister Akmal Nasrullah Mohd Nasir said the additional capacity must be managed carefully to maintain adequate electricity supplies.

Malaysia expects to need about 9 gigawatts of gas-fired power capacity by 2032 as electricity demand continues to rise.

The projection comes as the country gradually phases out coal-based generation. Economy Minister Akmal Nasrullah Mohd Nasir said the additional generating capacity would need careful management.

He said that approach would help ensure electricity supplies remain sufficient as Malaysiaโ€™s power needs grow.

About this summary

Originally published by Utusan Malaysia in Malay. Translated, summarized, and contextualized automatically by DistantNews, with a note on how the source frames the story. Not individually reviewed before publishing. How this works.