Morocco Invests $300 Million in Fez Sports Complex Rehabilitation for 2030 World Cup
Translated from Arabic, summarized and contextualized by DistantNews.
At a glance
- Morocco is rehabilitating the Fez Sports Complex with a budget of 2.816 billion dirhams for the 2030 World Cup.
- The project emphasizes strict sustainability standards set by FIFA, focusing on environmental preservation and local community benefits.
- Key goals include reducing energy consumption by 30%, water usage by 40%, and prioritizing low-carbon materials and renewable energy sources.
Morocco is undertaking a significant rehabilitation of the Fez Sports Complex, allocating 2.816 billion dirhams to the project as part of its preparations for the 2030 World Cup, which it will co-host with Spain and Portugal. The National Agency for Public Equipment has launched an international tender for the design and execution of this ambitious undertaking.
The rehabilitation project is designed to meet FIFA's stringent sustainability criteria. The goal is not only to create infrastructure suitable for a major sporting event but also to contribute to environmental conservation and enhance the quality of life for local residents. This includes a strong focus on reducing the complex's environmental impact while maximizing social and economic benefits for the city and its inhabitants.
Ambitious environmental targets are central to the project. The Fez Sports Complex aims to achieve a "high-quality environmental sustainability infrastructure" certification. This integrated approach covers all project phases, emphasizing eco-friendly design, biodiversity conservation, sustainable resource management, and user comfort. Companies involved will be bound by commitments to environmental performance, including appointing a qualified environmental certification manager and implementing plans for erosion control, waste management, and air quality.
Significant reductions in energy and water consumption are planned. The project anticipates cutting energy use by at least 30% through energy-efficient lighting, high-performance air conditioning, and improved insulation. It also aims to generate 5-10% of its electricity from renewable sources and install a centralized building management system to monitor and optimize energy use. Water consumption is targeted for a reduction of at least 40%, achieved through water-saving fixtures, rainwater harvesting for irrigation, and an enhanced stormwater drainage system.
Furthermore, the project prioritizes a reduced carbon footprint by using low-carbon materials like low-carbon concrete and recycled steel, and sourcing materials locally to minimize transport emissions. A circular economy approach will be adopted for waste management, focusing on sorting, reuse, recovery, and recycling. The rehabilitation also aims to integrate the complex harmoniously with the urban environment, improve accessibility via public transport, and ensure resilience against natural and climate-related risks.
Originally published by Hespress in Arabic. Translated, summarized, and contextualized by our editorial team with added local perspective. Read our editorial standards.