Panama's Maracaná Stadium undergoes major renovation for FIFA standards
Translated from Spanish, summarized and contextualized by DistantNews.
At a glance
- Panama's iconic Maracaná Stadium in El Chorrillo is undergoing a major renovation to meet FIFA standards.
- The project, 25% complete, includes replacing the natural grass field, expanding seating to approximately 5,000, and upgrading facilities.
- The stadium is slated for completion in December and aims to reopen for the 2027 Liga Panameña de Fútbol season.
Panama's historic Maracaná Stadium in El Chorrillo is being revitalized in a comprehensive structural renovation aimed at meeting international FIFA standards. The project, supported by Pandeportes, addresses the stadium's previous deterioration and seeks to transform it into a modern sporting venue.
Currently at 25% completion, the renovation involves approximately 130 daily workers. Key aspects include extensive structural recovery, such as deep corrosion treatment for the roof's metal structures and general masonry work. The project also focuses on upgrading the playing field by replacing the old synthetic turf with natural grass and installing a high-capacity drainage system.
Seating capacity will increase by 270 additional seats, bringing the total to around 5,000 spectators, with all stands receiving a new, high-traffic waterproofing system. The stadium will feature four changing rooms, including two large main rooms for home and visiting teams equipped with massage areas and warm-up zones, plus two additional changing rooms for youth categories. Administrative and press areas are also being redesigned with high-quality finishes.
Exterior improvements include new night lighting, neon-style lighting, and prominent signage to enhance the stadium's visibility from the main road. The construction company and Pandeportes aim to complete the renovation by December, with the stadium scheduled to reopen for the 2027 Liga Panameña de Fútbol (LPF) Torneo Clausura, as well as for Liga Prom and national team matches.
The remodeling registers currently a 25% of global progress.
Originally published by TVN Panamá in Spanish. Translated, summarized, and contextualized by our editorial team with added local perspective. Read our editorial standards.