DistantNews
Support us
๐Ÿ‡ฎ๐Ÿ‡ฉ Indonesia /Environment & Climate

The Long Struggle of the National Strategic Project Victims

From Tempo · () Indonesian

Summarized and contextualized by DistantNews.

At a glance

News Sources not specified Context piece
  • Indigenous communities in East Kalimantan are experiencing disruptions due to the construction of Indonesia's new capital city, Nusantara.
  • The Sepaku Semoi intake dam, built to supply water to the capital, has altered the Sepaku River, impacting local fishing and livelihoods.
  • Residents like Sibukdin, a traditional chief, report increased difficulty in fishing and changes to the river's width and depth since the dam's construction.

The construction of Indonesia's new capital city, Nusantara, in East Kalimantan is already impacting indigenous communities, altering their traditional ways of life.

Sibukdin, a 62-year-old traditional chief of the Balik Sepaku tribe, describes how the Sepaku River behind his home has changed significantly over the past three years. The river has widened and deepened, with its banks now reinforced with concrete revetments to combat erosion. These changes are directly linked to the Sepaku Semoi intake dam, a government facility built to channel water to the Central Government Core Area (KIPP) of Nusantara. The dam's construction has disrupted the natural flow of the river, making it increasingly difficult for the Balik Sepaku community to fish.

The geological composition of the KIPP, characterized by clay, makes groundwater extraction challenging, necessitating the Sepaku River as a water source for the new capital. However, this vital water supply for Nusantara comes at a cost to the local indigenous population. The dam has caused the river's water level to rise upstream, where the Balik Sepaku community resides, leading to the observed widening and deepening of the river.

Sibukdin's account highlights the tangible consequences of large-scale national projects on local communities. The altered river not only affects their ability to fish but also signifies a broader disruption of their environment and traditional practices. The report notes that this is the first group to be affected by the IKN construction, suggesting that more such impacts may follow as the project progresses.

It has become increasingly difficult for us to catch fish there since the river was dammed.

โ€” SibukdinA 62-year-old traditional chief of the Balik Sepaku tribe, describing the impact of the Sepaku Semoi intake dam on his community's livelihood.
DistantNews Editorial

Originally published by Tempo. Summarized and contextualized by our editorial team with added local perspective. Read our editorial standards.