DistantNews
Support us
๐Ÿ‡ท๐Ÿ‡ธ Serbia /Energy & Infrastructure

Train from Belgrade takes nearly eight hours to reach Sremska Mitrovica as passengers wait for hours without information

From N1 Serbia · () Serbian

Translated from Serbian and summarized by DistantNews. Read the original for the full story.

At a glance

News Named sources Ongoing story
  • A train that left Belgrade Centar late on Saturday took about eight hours to reach Sremska Mitrovica after losing electrical power between Golubinci and Stara Pazova.
  • Passengers said they waited for hours without clear information, and a replacement train also broke down before the journey resumed.
  • N1 said it had asked Srbijavoz about the failure and passenger communication procedures and would publish its response later.

A train from Belgrade Centar took nearly eight hours to reach Sremska Mitrovica after losing power on the line, leaving passengers stranded for hours, sometimes in darkness, without clear information about what was happening.

The train was scheduled to depart at 4:36 p.m. on Saturday but left about 50 minutes late. Around 6 p.m., it lost electrical power between Golubinci and Stara Pazova, beginning a long wait for passengers who said they received repeated assurances that another train would arrive or that the problem would soon be resolved.

A passenger told N1 that a replacement train eventually appeared shortly before midnight, but it too broke down and stopped. The train reached Golubinci around midnight, where another train had been waiting for three hours before the journey continued. Passengers arrived in Sremska Mitrovica at about 1 a.m.

What is additionally worrying is that no one responsible clearly explained either the trainโ€™s initial delay or what was actually happening after the power failure.

· N1 passengerThe passenger described the lack of information during the prolonged stoppage.

The passenger said the situation became tense and that some people broke windows and jumped from the train to get out. She said passengers had been trapped for hours without clear information about evacuation or when travel would resume, and called for accountability and concrete information during such incidents.

N1 sent Srbijavoz questions about the failure, the lengthy delay and procedures for informing passengers. The route normally has six daily trains. The scheduled 4:32 p.m. service should reach Sremska Mitrovica at 6:04 p.m., while the final train leaves Belgrade at 7:45 p.m. and arrives at 9:09 p.m.

The price has tripled, basically, from the moment the final siren went.

· Janice ReganThe Crows supporter described the rise in airfare costs after Adelaideโ€™s semifinal qualification.
About this summary

Originally published by N1 Serbia in Serbian. Translated, summarized, and contextualized automatically by DistantNews, with a note on how the source frames the story. Not individually reviewed before publishing. How this works.