DBKL to resurface 59km of Kuala Lumpur's main roads, targeting pothole-free status
Translated from Malay and summarized by DistantNews. Read the original for the full story.
At a glance
- Kuala Lumpur City Hall (DBKL) will resurface 59 kilometers of major roads from August 2026 to February 2027.
- The program aims to improve road safety and comfort, targeting a 100% pothole-free status and a 50% increase in pavement lifespan.
- Work will occur overnight between 10 p.m. and 5 a.m. to minimize traffic disruption.
Kuala Lumpur is set to undergo a significant road improvement initiative as City Hall (DBKL) launches a program to resurface 59 kilometers of its main thoroughfares. The project, scheduled to run in two phases from August 2026 to February 2027, aims to enhance safety and comfort for all road users. This extensive undertaking will cover approximately 1.3 million square meters, focusing on key routes such as Jalan Tun Razak, Jalan Kuching, Jalan Kinabalu, Jalan Sultan Ismail, Jalan Ampang, and the Kuala Lumpur-Seremban Expressway.
The road surface improvements will also help increase tire grip, especially in wet or rainy conditions.
The scope of the program extends beyond simple repaving. DBKL plans to include repairs to curbs, milling and paving, manhole cover adjustments, and remarking of road lines. Maintenance work on bridges, replacement of guardrails and bridge joints, installation of flexible poles, rumble strips, and repairs to traffic light systems are also part of the comprehensive plan. The use of Stone Mastic Asphalt (SMA14) is expected to provide better durability under heavy loads, while thermoplastic road markings will improve visibility at night.
Through the program, DBKL aims to increase the lifespan of the pavement by up to 50 percent, while ensuring the affected areas are 100 percent pothole-free, and routine maintenance costs can potentially be reduced by up to 40 percent.
DBKL anticipates that these improvements will extend the lifespan of the road surfaces by up to 50 percent. A primary goal is to achieve a 100 percent pothole-free status in the affected areas, potentially reducing routine maintenance costs by up to 40 percent. To minimize inconvenience, resurfacing operations will be conducted between 10 p.m. and 5 a.m., with phased lane closures to maintain traffic flow.
To reduce disruption to users, the resurfacing work will be carried out between 10 p.m. and 5 a.m. with phased lane closures to ensure traffic flow continues to move.
This initiative is framed as part of DBKL's commitment to its "City of Kindness" spirit, aiming to provide safer, higher-quality, and more durable public facilities. The city hopes these enhancements will lead to smoother and more comfortable journeys, reduce vehicle damage, and ultimately improve the quality of life for Kuala Lumpur's residents.
It is hoped that this will provide a smoother and more comfortable journey, reduce the risk of vehicle damage, and improve the quality of life for city dwellers.
Originally published by Utusan Malaysia in Malay. Translated, summarized, and contextualized automatically by DistantNews, with a note on how the source frames the story. Not individually reviewed before publishing. How this works.