DistantNews
Support us
Dong Thap Allocates Over $246 Million for Urgent Tien River Erosion Control
๐Ÿ‡ป๐Ÿ‡ณ Vietnam /Disasters & Emergencies

Dong Thap Allocates Over $246 Million for Urgent Tien River Erosion Control

From Tuแป•i Trแบป · () Vietnamese

Translated from Vietnamese, summarized and contextualized by DistantNews.

At a glance

News Official statement New plan
  • Dong Thap province has approved an urgent project costing over 246 billion VND to address severe erosion along the Tien River.
  • The project aims to reinforce the riverbank with a 1,100-meter dike to protect lives, property, and infrastructure.
  • This initiative is part of a larger provincial effort to combat riverbank erosion, with over 6.2 km already reinforced at a cost of more than 7.7 trillion VND.

Dong Thap province is investing more than 246 billion VND in an urgent project to combat severe erosion along the Tien River in Thuong Phuoc commune. The provincial People's Committee has approved the plan, which aims to reinforce the riverbank and prevent further landslips.

The project will construct a 1,100-meter dike using various reinforced concrete structures and geotextile sandbags. This infrastructure is crucial not only for protecting residents' lives and property but also for safeguarding local technical infrastructure and transportation networks.

This urgent measure is part of a broader, ongoing effort by Dong Thap to mitigate the unpredictable impacts of riverbank erosion. Since 2016, the province has completed 49 projects along rivers and coastlines, spanning over 76.7 kilometers and costing more than 5.5 trillion VND. These efforts have significantly enhanced safety for residents and protected vital infrastructure.

DistantNews Editorial

Originally published by Tuแป•i Trแบป in Vietnamese. Translated, summarized, and contextualized by our editorial team with added local perspective. Read our editorial standards.