Hoeselt swimming pool closed for at least two years due to advanced concrete rot
Translated from Dutch, summarized and contextualized by DistantNews.
At a glance
- The Ter Kommen swimming pool in Hoeselt has been closed for at least two years due to advanced concrete rot.
- A routine inspection revealed severe structural instability, with the rebar in the concrete completely corroded.
- Visitors and staff will relocate to De Kimpel in Bilzen starting in September, with schools and swimming lessons guaranteed transport.
The Ter Kommen swimming pool in Hoeselt faces a minimum two-year closure after advanced concrete rot compromised its structural integrity. A recent technical report revealed that the rebar supporting the pool's concrete structure has been severely corroded, with some areas showing no remaining rebar at all. This discovery has led to the immediate closure of the facility, which dates back to 1975, to ensure public safety.
We cannot take the risk that the edge collapses while people are on it.
Mayor Bruno Stegen explained that the corrosive effects of chlorine in the pool water had penetrated the concrete, leading to the widespread damage. "We cannot take the risk that the edge collapses while people are on it," Stegen stated, emphasizing the need to prioritize safety. The decision to close the pool was immediate after receiving the "devastating report."
Sports and education alderman Peter Thijs assured that solutions were quickly found for the pool's primary users. "Our priority was immediately with the schools and swimming lessons," Thijs said, noting that six regional schools utilize the facility. These schools, along with swimming lessons, will be relocated to De Kimpel in Bilzen. "The transport to and from the swimming lessons will also be guaranteed for the schools," the alderman added.
Our priority was immediately with the schools and swimming lessons.
Staff from the Hoeselt pool will also transfer to De Kimpel, ensuring continuity for swimming lessons. Thijs highlighted that this "pooling of forces" will maintain the quality of instruction. While the exterior of the pool showed no signs of damage, the internal structural issues were a "technical drama," according to Mayor Stegen. The future of the pool remains uncertain, with a more detailed assessment expected in about two months.
The transport to and from the swimming lessons will also be guaranteed for the schools.
Originally published by VRT NWS in Dutch. Translated, summarized, and contextualized by our editorial team with added local perspective. Read our editorial standards.