Jendouba Dam Construction Faces Tight Deadlines
Translated from French, summarized and contextualized by DistantNews.
At a glance
- Construction on the Raghai dam in Jendouba, Tunisia, is facing pressure to meet deadlines.
- The dam, designed to hold 30 million cubic meters of water, is crucial for regional development.
- It will supply drinking water, irrigate farmland, and recharge groundwater, boosting the local economy.
Tunisia's Ministry of Agriculture is pressing contractors to accelerate work on the strategic Raghai dam in Jendouba, a project vital for the region's economic and social development. Officials inspected the site, emphasizing the need for intensified efforts and better coordination to adhere to contractual timelines. The dam, with a planned capacity of 30 million cubic meters, is expected to significantly improve water resources. It will provide drinking water to local populations, irrigate agricultural lands, and replenish the groundwater table. This infrastructure is seen as a key driver for progress in a governorate that has long awaited such a development. The inspection included assessing the construction base, equipment, and operational readiness, with practical measures identified to overcome potential obstacles and ensure continuous progress. The project involves the Ministry of Agriculture's General Directorate of Dams and Hydraulic Works, a Chinese construction company, and an engineering consortium overseeing the work.
The efforts must be redoubled, coordination between stakeholders strengthened, and contractual deadlines met.
Originally published by La Presse in French. Translated, summarized, and contextualized by our editorial team with added local perspective. Read our editorial standards.