Mexico State bridge construction advances 21%, to benefit 2 million
Translated from Spanish, summarized and contextualized by DistantNews.
At a glance
- Construction of the Peñón-Texcoco–Periférico elevated vehicular bridge in Mexico State has reached 21% completion.
- The project, part of the Eastern Zone Integral Plan, aims to benefit 2 million people and ease traffic for an estimated 53,000 daily drivers.
- Officials highlighted the inter-institutional coordination between federal, state, and municipal governments in advancing the infrastructure project.
Nezahualcóyotl, Mexico State – The construction of the Peñón-Texcoco–Periférico elevated vehicular bridge has achieved 21% progress in its foundation work, just one month after commencing operations.
Officials from the State of Mexico's Ministry of Mobility (Semov) conducted a supervisory tour of the project, which is a key component of the Eastern Zone Integral Plan. This initiative was promoted by President Claudia Sheinbaum Pardo in collaboration with Governor Delfina Gómez Álvarez.
The bridge's main structure will span 300 meters, with an additional 400 meters for access ramps and descents. It will feature four lanes of traffic, two in each direction. Technicians are currently installing 170 piles, each reaching depths of 30 to 33 meters, tailored to the local soil conditions. The project is expected to benefit 2 million residents and manage an average daily traffic flow of 53,000 vehicles.
Juan Hugo de la Rosa, Secretary of Mobility, emphasized the project's priority status within the "2026, Year of Works in the State of Mexico" strategy. He stated that the bridge will significantly improve connectivity between the Peñón-Texcoco highway, the Periférico Oriente, Avenida Oceanía, the Circuito Interior, and the Mexico City International Airport. Officials also stressed the strong inter-institutional coordination among federal, state, and municipal governments, as well as Mexico City authorities, in advancing this crucial infrastructure.
The bridge represents a direct intervention to reduce travel times, decongest and improve connectivity with the country's main airport.
Originally published by El Universal in Spanish. Translated, summarized, and contextualized by our editorial team with added local perspective. Read our editorial standards.