DistantNews
Support us
Panama's Corredor de las Playas expansion reaches 5% completion; bridge construction to start in September
๐Ÿ‡ต๐Ÿ‡ฆ Panama /Energy & Infrastructure

Panama's Corredor de las Playas expansion reaches 5% completion; bridge construction to start in September

From TVN Panamรก · () Spanish

Translated from Spanish and summarized by DistantNews. Read the original for the full story.

At a glance

News Sources not specified Ongoing story
  • The expansion of Panama's Corredor de las Playas highway has reached 5% completion.
  • Construction of vehicular bridges is scheduled to commence in September.
  • The project involves widening a 20-kilometer stretch of road to improve traffic flow and safety.

Work on the expansion of Panama's Corredor de las Playas highway is progressing, with current completion at 5%. The project, which spans approximately 20 kilometers, aims to significantly enhance mobility and road safety in the western part of the country.

Minister of Public Works Josรฉ Luis Andrade recently toured the construction sites, from El Nazareno in La Chorrera to Campana in Capira. The ongoing work is being carried out both day and night to maintain the project's timeline.

A key phase of the project, the construction of vehicular bridges, is slated to begin in September. The MOP (Ministry of Public Works) awarded the contract for this section, known as "Ampliaciรณn del Corredor de las Playasโ€“Tramo Carretera Panamericana (CPA) El Espinoโ€“Sajalices y Variante de Campana," to Constructora MECO, S.A.

The expansion will widen the highway from four to six lanes, starting from the entrance of Hacienda Los Calderones in La Chorrera district up to the bridge over the Sajalices River in Chame. This upgrade is expected to alleviate traffic congestion and improve the overall travel experience for residents and visitors in the region.

About this summary

Originally published by TVN Panamรก in Spanish. Translated, summarized, and contextualized automatically by DistantNews, with a note on how the source frames the story. Not individually reviewed before publishing. How this works.