DistantNews
Support us
๐Ÿ‡น๐Ÿ‡ผ Taiwan /Energy & Infrastructure

Taiwan Railways Considers River Bridge Early Warning Systems Amid Eastern Flood Threats

From Liberty Times · () Chinese

Translated from Chinese, summarized and contextualized by DistantNews.

At a glance

News Sources not specified Ongoing story
  • Taiwan Railways is considering installing bridge early warning systems across rivers in eastern regions following recent flood damage.
  • A new system involving water level gauges and sensors is being studied for the Xinwanli Creek Bridge after a landslide-induced lake burst.
  • The railway administration hopes to avoid further budget delays for these new safety initiatives after experiencing significant setbacks this year.

Taiwan Railways is exploring the installation of early warning systems for bridges spanning rivers in its eastern network, a move prompted by recent flood-related damage and the threat of landslides. The railway administration is particularly examining a proposal to equip the Xinwanli Creek Bridge with water level gauges and sensors upstream.

The Wanli Creek landslide lake incident in June this year has once again prompted Taiwan Railways to reconsider the early warning safety of railway operations over riverbeds.

โ€” Liu Shuang-huoTaiwan Railways Administration Deputy General Manager Liu Shuang-huo explained the motivation behind considering new early warning systems.

This consideration comes after several incidents in eastern Taiwan's railway lines, including severe landslides and bridge damage, particularly after the April 3rd earthquake and strong typhoons. The most significant event occurred in July 2024 when Typhoon Kemi's heavy rains washed out a section of the railway bridge over Xiaochuishui Creek, causing prolonged disruptions to train services on the eastern main line.

More recently, in June, a landslide in Hualien formed a massive landslide lake on the Wanli River. The Xinwanli Creek Bridge is situated directly over this riverbed. Taiwan Railways Administration Deputy General Manager Liu Shuang-huo stated that this event has prompted a re-evaluation of safety measures for railway lines crossing riverbeds. The proposed system would involve installing water level gauges and sensors upstream to provide early alerts of potential risks, with the aim of detecting rising water levels and notifying relevant parties in advance.

The concept is to install water level gauges upstream to provide early warning of risks, and add sensors. If the river water rises, it can be notified in advance.

โ€” Liu Shuang-huoDeputy General Manager Liu Shuang-huo described the proposed early warning system for the Xinwanli Creek Bridge.

Liu Shuang-huo noted that the exact implementation details, including the number and placement of these devices, require on-site assessments and engineering designs. As this is a new project requiring budget allocation, the administration is keen to avoid the kind of budget delays experienced this year, which could impede the timely deployment of these critical safety enhancements. The railway is also reviewing the safety of other bridges located over river systems.

Because this is a new project budget, we do not want to see the situation of the total budget being delayed again.

โ€” Liu Shuang-huoDeputy General Manager Liu Shuang-huo expressed concern about potential budget delays for the new safety initiatives.
DistantNews Editorial

Originally published by Liberty Times in Chinese. Translated, summarized, and contextualized by our editorial team with added local perspective. Read our editorial standards.