DistantNews
Support us
NEA workers urge Prime Minister Shah to speed up rescue of people trapped in hydropower tunnels
๐Ÿ‡ณ๐Ÿ‡ต Nepal /Elections & Politics

NEA workers urge Prime Minister Shah to speed up rescue of people trapped in hydropower tunnels

From OnlineKhabar English · () English

Translated from English and summarized by DistantNews. Read the original for the full story.

At a glance

News Named sources Ongoing story
  • Nepal Electricity Authority employees urged Prime Minister Balen Shah to accelerate rescue operations for workers trapped or missing at hydropower projects after floods in Rasuwa.
  • The employees questioned why foreign rescue teams had not received timely permission and why crews appeared to be working sequentially rather than simultaneously.
  • Hundreds of workers have been reported missing across several projects, while the Nepal Army has recovered two bodies from the Chilime project tunnel.

Nepal Electricity Authority employees have asked Prime Minister Balen Shah to intervene immediately, warning that delays could cost the lives of colleagues and workers trapped inside hydropower tunnels.

The employees wrote under pseudonyms because they feared retaliation. In a letter obtained by Onlinekhabar, they said every minute had become critical and questioned why foreign rescuers and other groups ready to help had not received permission or coordination in time.

Why are we unable to conduct rescue operations simultaneously at all the locations where they are urgently needed?

โ€” Nepal Electricity Authority employeesThe employees questioned why rescue teams appeared to be working at one location at a time.

They also challenged the apparent decision to conduct rescue work sequentially, with one site handled before operations began at another. โ€œWhy are we unable to conduct rescue operations simultaneously at all the locations where they are urgently needed?โ€ they asked.

The employees urged the government to remove administrative delays, authorise capable national and international rescue teams, and mobilise resources at all critical locations. โ€œThe priority right now is only to save lives. Every minute of delay could mean losing someoneโ€™s chance of survival,โ€ they wrote.

We sincerely request that necessary steps be taken immediately to accelerate the ongoing rescue operations.

โ€” Nepal Electricity Authority employeesThe letter called for immediate action to speed up rescue work.

Hundreds of employees and workers linked to Nepal Electricity Authority projects and subsidiaries have been reported missing after floods in Rasuwa. The flooding damaged projects including Upper Trishuli 3A, Upper Trishuli 3B, Rasuwagadhi, Chilime, Trishuli and Devighat.

The priority right now is only to save lives. Every minute of delay could mean losing someoneโ€™s chance of survival.

โ€” Nepal Electricity Authority employeesThe employees described the urgency of the rescue effort.

The Nepal Army has recovered two bodies from the Chilime tunnel. An army team entered the Rasuwagadhi tunnel but returned without finding anyone. An Electricity Authority source said at least three people had been working at the powerhouse that day because the facility was operating, but the team had not reached it.

Workers at other projects, including Upper Trishuli-1, Langtang, Mailung Khola, Rasuwa Bhotekoshi and Middle Trishuli, have also been reported missing.

Please take action now. There is no time to wait.

โ€” Nepal Electricity Authority employeesThe letter ended with a direct appeal for immediate intervention.
About this summary

Originally published by OnlineKhabar English in English. Translated, summarized, and contextualized automatically by DistantNews, with a note on how the source frames the story. Not individually reviewed before publishing. How this works.