DistantNews
Support us
Paraguay: Traffic diversions begin for Tape Tuja viaduct construction

Paraguay: Traffic diversions begin for Tape Tuja viaduct construction

From ABC Color · () Spanish

Translated from Spanish, summarized and contextualized by DistantNews.

At a glance

News Named sources Ongoing story
  • Traffic diversions will be in place around the Ñu Guasu Park area in Paraguay starting Saturday due to construction on the Tape Tuja return viaduct.
  • The Ministry of Public Works and Communications (MOPC) will manage traffic flow, with work scheduled for Saturday and Sunday.
  • The project is part of a larger road duplication initiative, the "Corredor Vial Las Residentas," and includes drainage work in another area.

Drivers in Paraguay should prepare for traffic disruptions around the Ñu Guasu Park as construction on the Tape Tuja return viaduct intensifies. Starting Saturday, August 15, the Ministry of Public Works and Communications (MOPC) will implement lane realignments to facilitate the lifting of viaduct beams. This work is part of the broader duplication of Route D025, known as the "Corredor Vial Las Residentas."

On Saturday, work will focus on the Luque-bound lane, requiring the opposite carriageway to operate as a temporary two-way street. Traffic exiting the city will use the external lane and shoulder, which will be exceptionally opened for vehicles. On Sunday, the focus shifts to the outbound lane towards Asunción. Travelers heading to Asunción will use a lane from the opposite direction, while the Luque entrance will remain open with traffic controllers present.

Ing. José Cabrera, coordinator of the MOPC's Strategic Projects Unit, emphasized efforts to minimize inconvenience, stating, "We are taking advantage of the holiday and the reduced weekend traffic to cause the least possible disruption. We guarantee the availability of the road for all users at all times." Additionally, the MOPC is undertaking drainage channel work at the intersection of General Elizardo Aquino and Sudamericana avenues until late August, which has closed the left lane entering Luque.

We are taking advantage of the holiday and the reduced weekend traffic to cause the least possible disruption. We guarantee the availability of the road for all users at all times.

— Ing. José CabreraCoordinator of the Strategic Projects Unit (UEPE) of the MOPC, explaining the traffic management plan.
DistantNews Editorial

Originally published by ABC Color in Spanish. Translated, summarized, and contextualized by our editorial team with added local perspective. Read our editorial standards.